Tankerman · Operations — Loading Plan / Stress and Stability

A cargo loading/discharge plan for a tank vessel is prepared in advance primarily to:

Explanation

The plan sequences tanks and rates so that at every stage the still-water bending moment and shear force, the stability (GM, free surface), and the trim/list stay within limits, and no tank is overfilled. A loading computer is used to verify the plan and monitor the operation.

Authority: ISGOTT; SOLAS (loading)

Practice the full Tankerman bank

Free spaced-repetition quizzing across 2550 USCG exam questions — it schedules your reviews so the ones you miss come back until they stick.

Related Tankerman questions