Tankerman · Transfer — Lighting
During a night transfer, the regulations require the transfer work area and connection points to be:
- AKept dark to avoid ignition
- BAdequately illuminated for safe operation✓ Correct
- CLit only by handheld phones
- DLit only on the dock side
Explanation
The transfer area, including connections and controls, must be adequately lit at night so the watch can monitor the operation and detect leaks. Fixtures in hazardous areas must be of an approved explosion-proof type.
Authority: 33 CFR 156.120
Practice the full Tankerman bank
Free spaced-repetition quizzing across 2190 USCG exam questions — it schedules your reviews so the ones you miss come back until they stick.
Related Tankerman questions
- Transfer — PIC
During a cargo transfer on a tank vessel, the Person-In-Charge (PIC) is primarily responsible for:
- Transfer — DOI
Before a transfer of oil or hazardous material begins, the PICs of the transferring and receiving facilities must complete and agree on a:
- Safety — Inert Gas
The purpose of an inert gas system on a tanker is to:
- Safety — Inert Gas
A cargo tank is generally considered properly inerted when the oxygen content is held at or below:
- Safety — Flammability
A hydrocarbon vapor/air mixture will burn only when its concentration is:
- Safety — Static
To prevent a static-electricity ignition hazard during loading of a static-accumulating cargo, the tankerman should: